搜索
language
中国
韩国
韩国
韩国
韩国
韩国
News
Current location:
Homepage
-
-
-
Anti-rotation cementing plug manufacturers simply give examples of cementing methods

Anti-rotation cementing plug manufacturers simply give examples of cementing methods

(Summary description)Single-stage double-plug casing cementing is the most common cementing method for offshore drilling. It uses double-casing rubber plugs (top and bottom plugs) for cementing.

Anti-rotation cementing plug manufacturers simply give examples of cementing methods

(Summary description)Single-stage double-plug casing cementing is the most common cementing method for offshore drilling. It uses double-casing rubber plugs (top and bottom plugs) for cementing.

Information

Single-stage double-plug casing cementing is the most common cementing method for offshore drilling. It uses double-casing rubber plugs (top and bottom plugs) for cementing. The process flow is shown in the figure. Generally, common casing plugs are used for cementing on jack-up platforms or jackets, while SSR plugs are used for cementing on floating platforms. When using single-stage double rubber plug cementing, the casing string accessories are mainly composed of floating shoes, floating hoop, centralizer and rubber plug.

Anti-rotation cementing plug cost

Liner cementing is a cementing method in which the liner is sent to the suspension design depth with a drill pipe, and the liner is suspended on the outer casing by the liner hanger, and then the cementing operation is started. Tailpipe hangers can be divided into two types: mechanical and hydraulic, we usually use hydraulic tailpipe hangers
To deal with lost circulation, abandoned wells, backfilling depleted horizons, sidetracking and isolating formations, cement plugging technology is required, and balanced plugging is the most commonly used method. When pouring the cement plug, firstly lower the drilling tool to the top of the design depth of the cementing plug, pour cement and replace the cement slurry (to ensure that the cement surface in the pipe is higher than the height of the annular cement plug surface), and then slowly pull out the drilling tool and leave the cement The top surface of the plug is flushed cleanly in a cycle, leaving the cement plug in its original position.

Keyword:

Scan the QR code to read on your phone

Relevant information

Recommended news

Online message

Username used for comment:
Message
Description:
wander

Contact us

Address: Hengdong Road, Hejian City

Mobile phone: 13131777559   13127378823

Online customer service
Service time:
9:30 - 18:00
Customer service group:
在线客服
WhatsApp:
WhatsApp:

Copyright © 2021 Brief introduction of Hejian Huidong drilling and production parts Co., Ltd       冀ICP备19028853号-1     Powered by www.300.cn

Message
code