搜索
language
中国
韩国
韩国
韩国
韩国
韩国
News
Current location:
Homepage
-
-
-
How to apply External casing packer for thermal recovery in oil well cementing

How to apply External casing packer for thermal recovery in oil well cementing

(Summary description)In the case of complex geological conditions, active underground fluids, and poor cementing quality, after statistics, comparison, analysis,

How to apply External casing packer for thermal recovery in oil well cementing

(Summary description)In the case of complex geological conditions, active underground fluids, and poor cementing quality, after statistics, comparison, analysis,

Information

In the case of complex geological conditions, active underground fluids, and poor cementing quality, after statistics, comparison, analysis, and research, through measures such as improving the cement slurry system and using casing packers, the high-quality cementing rate in this area has been improved. Greatly improve.

External casing packer for thermal recovery supplier


In addition, the cementing construction of the External casing packer for thermal recovery in the high-pressure oil and gas well also solves the problem of the high-pressure oil and gas running into grooves when the cement solidifies.
External casing packer for thermal recovery is also widely used in segmented cementing. After the casing packer is expanded, the cement slurry is returned to the casing for cementing through the multi-stage cementing device.
Lost wells can be divided into three categories: fractures, cavernous lost wells and permeable lost wells. Different leaks should take different construction measures during drilling and cementing construction. According to the leakage situation, the leakage layer should be treated before cementing, and the balanced pressure cementing design should be carried out after the treatment. For leakage-prone layers and collapsed layers, conventional cementing leakage prevention measures include increasing the lower-density pre-fluid, controlling the length of the cement sealing section, and using a low-density cement slurry system. It is also possible to use the casing outer packer to seal the above interval in layers, so as to solve the problems of oil, gas, water channeling and leakage pressure in the above well interval, resulting in insufficient return height.

Keyword:

Scan the QR code to read on your phone

Relevant information

Recommended news

Online message

Username used for comment:
Message
Description:
wander

Contact us

Address: Hengdong Road, Hejian City

Mobile phone: 13131777559   13127378823

Online customer service
Service time:
9:30 - 18:00
Customer service group:
在线客服
WhatsApp:
WhatsApp:

Copyright © 2021 Brief introduction of Hejian Huidong drilling and production parts Co., Ltd       冀ICP备19028853号-1     Powered by www.300.cn

Message
code